Party Wall PRO has been used to serve party wall notices and awards since 2016. This study pools the anonymised records of every notice, response and award managed through the platform over that period to answer the questions surveyors are asked every week: will the neighbour consent, how long will they take to reply, and how long until the award is served?
The report covers volumes and seasonality, how adjoining owners respond, how long matters take, and closes with five practical ways party wall surveyors can put the numbers to work.
67% of adjoining owners dissent. Of those, 64% appoint their own surveyor.
Median time to a response. Only 44% reply inside the statutory 14 days.
The median. One job in ten takes more than 193 days.
Median 52 days to award with an agreed surveyor against 84 with two.
Company-owned neighbours appoint their own surveyor 60% of the time and consent just 11%.
Own-surveyor rate inside London postal districts versus everywhere else. Awards take five weeks longer.
Thursday is the most common day to serve both notices and awards.
Of neighbours sent a 10-day letter, 61% then respond.
Get the full report. All the tables, trends and practical recommendations in an 8-page PDF, free to download.
Download PDFPublished by Lexitup Limited (DBA Party Wall PRO) for general information only; not legal, surveying or other professional advice. Statistics are derived from anonymised, aggregated records of matters managed through Party Wall PRO, are weighted towards London and the South East, and may not be representative of party wall matters generally. No personal data or information identifying any firm, client, owner, property or matter is included.